For renovators and old-building owners

Renovation: a surprise behind every wall. A plan in front of each.

No project breaks budgets as reliably as an old building: damp basements, decayed wiring, hazardous finds — the one plannable thing is that something intervenes. BOB plans the uncertainty in: measures as ranges, a 15–20% reserve, subsidies as their own sources.

Period building in scaffolding during renovation

Where it breaks

01

The building lies

Plans from 1962, three conversions later: nobody knows what sits behind plaster and boards — until it is open and costs money.

02

Measures depend on each other

Heating sized before insulation, bathroom tiled before pipes: wrong order is the most expensive renovation mistake.

03

Subsidies change the maths

German BEG, KfW, state programmes: grants change what pays off — but they come with deadlines, evidence and conditions.

How BOB helps

A renovation template by measures

Instead of 30 new-build trades: measure packages like roof, façade, windows, heating, bathroom — each with its own item, budget and contract status.

A 15–20% reserve, built in

BOB recommends a higher reserve for renovations than for new builds — and runs it as a non-deletable item. The hazardous find becomes a transfer, not a construction stop.

Subsidies as funding sources

Grants and subsidised loans run as their own sources with status: applied, approved, paid out. You see coverage with and without them — in case a decision goes differently.

Collect documents as they come

Trade invoice, DIY store receipt, material delivery: everything by photo into the inbox. With many small amounts, automatic matching is worth gold.

How to start: renovation calculator with your measures → turn the range into a cost plan → confirm the reserve, add subsidies as sources. Then collect quotes measure by measure.

From a bathroom to a full renovation. Below about €10,000 a sheet of paper often suffices; once several trades, a subsidy or a loan are involved, the structure pays off — at the latest when the second surprise nibbles the reserve.

No — applications run with KfW, BAFA or the state. BOB manages what follows: grants as funding sources with status, and the documents you need as evidence, collected cleanly per measure and exportable.

Rule of thumb: envelope before systems before surfaces. An energy consultant’s roadmap adds structure and, in Germany, extra subsidy points. In BOB you set up measures with time ranges — the liquidity view shows whether the order works financially too.

The classic: move into the ground floor, renovate upstairs. BOB is fine with that — measures have their own time ranges and budgets, and the monthly line shows what the double load of rent/rate plus renovation really means.